Gas for ceramic tile production
SNH proceeded with the gas supply of a ceramic tile production factory built by a subsidiary of the Chinese group Keda on June 14, 2024. Located in the suburbs of the city of Kribi, the related project minimally takes into account needs estimated between 3.5 and 6.5 million cubic feet per day of natural gas, over 20 years. Initial daily production is estimated at 50,000 square meters of tiles.
SNH has built a 5.27 km long gas pipeline which originates at the Bipaga natural gas processing center set up by the company and its partner Perenco, which operates it. The gas pipeline, operated by SNH, cost nearly 7.2 billion FCFA.