http://207.244.241.76/wp-content/uploads/2025/04/img-floater-brown-huge-Copie-1.png
http://207.244.241.76/wp-content/uploads/2025/04/img-brown-floater-1.png

Home > OperationsThe Pipeline Transportation SystemCOTCO

http://207.244.241.76/wp-content/uploads/2025/04/Station-de-pompage-PS-3-a-Belabo-3.jpg
http://207.244.241.76/wp-content/uploads/2020/11/img-red-skew.png
COTCO S.A

OUR EXPORT TRANSPORTATION SYSTEM

Pipeline length

1,081 km, of which 903 km in Cameroon

Transport capacity

225,000 barrels/day

Right of way width

30 to 50 m

Land-based operational facilities

3 pumping stations, including 2 in Cameroon (at Dompta and Belabo), and a pressure reduction station (PRS) at Kribi

Offshore facilities

one floating storage and offloading vessel (Komé-Kribi 1)